Back to all integrations

Issue tracking

Lineman and Jira

Write each issue's cumulative AI cost onto the Jira ticket as a field.

What this gets you

Lineman writes each issue's cumulative AI spend onto the Jira issue itself, into a number field named exactly "AI Spend (Lineman)", refreshed hourly. Anyone who opens the issue sees what the work has cost so far without opening Lineman. On company-managed (classic) projects Lineman creates the field and adds it to the issue screen for you. Team-managed (next-gen) projects manage their own fields, so the field is added once to each work type you track.

What people use it for

  • Cost on the issue itself

    The spend for an issue sits in a field on that issue, so a lead or product manager reading the ticket sees the figure in place. Ticking a project in the picker is what starts the write-back, on the next hourly run.

  • Attribution from the issue key

    Name the branch after the issue, or mention its key, for example ABC-123, and the spend from that work is attributed to that issue.

  • One cumulative figure, refreshed hourly

    Each tracked issue carries a single cumulative total: every cost recorded against it so far, rewritten on each hourly run, or when you press Re-check on the integration page. If a write-back starts failing, the integration status page shows a note with guidance for the affected project.

More in Issue tracking

Set up Jira

The documentation walks through connecting it, what Lineman reads and writes, and the settings worth knowing about.

Read the setup guide

Looking for something else?

Every integration in one place, searchable by name and filterable by what it does.

View all integrations